Professional landscaping services designed for Florida residential properties.
Licensed & insured Contractors

Professional Landscaping Services

Landscaping design and installation company serving North & South Florida, providing complete outdoor solutions that improve curb appeal.

Get a Free Estimate

Trusted by Florida's finest homeowners

Custom landscape design with plants and greenery for Florida homes
Backyard landscaping enhancing outdoor living spaces in Florida
Residential landscaping installation combining hardscape and softscape in Florida

Professional Landscaping Contractors in North & South Florida

Our landscaping company offers full-service landscape design, installation, and maintenance in North & South Florida, using native plants and sustainable practices to enhance curb appeal and property value.

What do we do!

Professional Landscape Design & Maintenance Services

We provide full-service landscaping in North & South Florida, using native plants and sustainable designs to enhance curb appeal.

Landscape Design & Consultation

South & North Florida designers provide consultations, create scaled plans, and develop tailored landscape designs

Sod Installation Contractors

Installers lay fresh, high‑quality sod to instantly improve curb appeal and establish new lawns

Plant & Tree Installation Services

Landscape contractors plant trees, shrubs, and flowers using proper techniques for long‑term health

Hardscape & Paver Patio Construction

Builders install paver patios, walkways, and retaining walls to enhance outdoor living spaces

Landscape Lighting Installation

Professionals design and install LED path lights, uplights, and security lighting for nighttime beauty

Drainage System Installation

Contractors install French drains, catch basins, and grading solutions to protect landscapes from water damage

Mulching & Edging Services

Landscape teams apply mulch and define edges to retain moisture and polish planting beds

Native Plant & Sustainable Landscaping

Designers incorporate native plants, xeriscaping, and rain gardens for eco‑friendly, low‑maintenance yards
Neglected Florida yard before professional landscaping installation by Mr. & Mrs. Outdoor LivingLush tropical landscape completed by Mr. & Mrs. Outdoor Living, transforming a Florida residential property
Before
After

From Neglected Yard to a Lush Tropical Landscape

Your South Florida yard deserves better than bare dirt and overgrown weeds. Mr. & Mrs. Outdoor Living designs and installs vibrant tropical landscapes built to thrive in Florida's climate — clean, lush, and genuinely low-maintenance.

Design-Build Authority

One team handles design, permits, engineering, and construction. No subcontractor surprises, no gaps in accountability.

Licensed & Engineered

Florida licensed and insured professionals. Every project is built to code, built to last, and built to impress.

Our Landscaping Design Process

Our landscaping company manages design, plant selection, installation, and ongoing care to deliver thriving outdoor spaces across North & South Florida.

1
2
3
4
Our Florida landscaping team collaborates with you to develop a comprehensive design plan — finalizing plant selections, measurements, and project timelines before work begins.

Landscape Consultation & Site Analysis

Comprehensive landscape assessment including soil conditions, sunlight exposure, salt-air resilience (South FL), plant selections, and hardscape integration. Climate-appropriate plant recommendations.

Existing vegetation and debris are cleared, the area is graded for proper drainage, and all plants and landscape materials are ordered and scheduled for your project delivery date.

Landscape Design & Visualization

Complete landscape design showing plant placement, seasonal color progression, irrigation integration, and hardscape features (planters, pathways, focal points). 3D renderings of mature landscape.

Native trees, plants, and groundcovers are installed per your design. Soil amendments, mulch, rock, and finishing materials are applied for a vibrant, structured Florida landscape.

Materials & Irrigation Planning

Specification of plant materials, mulches, soil amendments, and custom hardscape elements. Irrigation system design optimized for plant health and water conservation.

A thorough walkthrough verifies plant placement, mulch application, and site cleanliness. Your new Florida landscape is fully inspected and ready to enhance your property value.

Installation & Establishment

Full landscape installation including soil preparation, plant installation, hardscape placement, irrigation system installation, and initial maintenance (mulching, staking). Establishment care plan provided.

Landscaping Services FAQs

Have questions about professional landscaping installation in North or South Florida? Our expert team answers the top questions from Florida homeowners.

Where We Serve

Regional Coverage With National Vision

Aerial drone view of a luxury custom pool and outdoor living project in South Florida, showcasing modern pool design by expert custom pool builders.

South Florida

Licensed luxury pool builders in South Florida specializing in custom inground pools and outdoor living design-build projects, engineered, permitted, and built for high-end residential properties.

View South Florida Service Areas
Service areas map showing North Florida coverage for luxury custom pool builders and outdoor living services.

North Florida

Licensed luxury pool builders in North Florida specializing in custom inground pools and outdoor living design-build projects, engineered for structural integrity and long-term durability.

View North Florida Service Areas
TESTIMONIALS

What Our Clients Say About Mr & Mrs Outdoor Living

Hear from Florida clients who love how our landscaping company transformed their properties with native plants, refined hardscaping, and lasting beauty.

Trusted by Florida's finest homeowners